The industrial base is also in an investment phase. Documentation for Fabbricato 70 reports a 2026 workforce of 1,318 employees and agency workers, compared with 1,077 employees reported in 2023 on a non-identical perimeter. F70 adds 5,381 square metres and around €15.81 million of works, with contractual delivery indicated for 30 March 2027; the FSW3 expansion, up to €6 million, strengthens a qualified welding process that is difficult to replicate. [R35–R36]
This combination of heritage and new assets creates an industrial barrier, not an automatic guarantee. A site can own excellent infrastructure and still gradually lose product ownership, new bids or budget. Turin’s strategic position should therefore be measured by linking people, processes, assets, programmes, workload, design authority and the 2027–2032 pipeline—not simply by checking whether buildings remain open.
Turin is strategic because it combines heritage, special processes, new investment and supply-chain depth; that value needs to be protected as a system, not as real estate.