The third document is a product-line and technical-responsibility map, including RACI, design authority, bid leadership and configuration control. The fourth is an R&D/capex/IP plan showing where the next technology cycle will be built. The fifth is the accountability matrix linking decisions, deadlines and remedies.

Not all of these documents need to be fully public. Confidential versions can coexist with institutional or social summaries. What cannot be missing is evidence that the decisive variables have been measured and that responsibility for protecting them has been assigned.

Perimeter, site-level business plan, technical authority, investment plan and accountability matrix are the minimum information set for a robust assessment.