Versus the counterfactual, the model estimates −200/−320 FTE at the site and −160/−300 in the supply chain, for −360/−620 in total. Attrition, lower contractor use and redeployment can absorb part of the effect; a residual of 50–140 direct exits becomes possible if new orders do not arrive within 24–36 months. Suppliers face additional pressure from smaller lots, pricing and working capital.
Technology deteriorates before headcount. Chief engineers and product managers move, technical career paths weaken, R&D becomes support work and critical skills thin out. Warning signals are therefore RACI and configuration boards, backlog coverage below 24 months, F70 utilisation below 70%, a real 15% fall in supplier orders and net headcount reduction above 8% without a redeployment plan.
The severe scenario does not require site closure; sustained loss of authority, pipeline and utilisation is enough to turn Turin into a subordinate execution centre.